If your home or business is on fibre to the node (FTTN) or fibre to the curb (FTTC), you may be able to upgrade to full fibre to the premises (FTTP) through your internet provider. nbn installs its own equipment for free, but you order the upgrade through a participating provider, and you may need a qualifying speed plan. Since 1 July 2026, FTTC homes no longer need a high-speed plan to qualify. FTTN customers still need one until 31 March 2027, when nbn says that rule will go. The installation itself usually takes 2 to 4 hours.
Updated October 2026. This guide explains who can get the nbn fibre upgrade, how to check your address, what it costs, how the installation works and what to decide before the technician arrives. We have summarised nbn documents in plain English, but nbn’s rules change from time to time, so check the current versions with nbn and your provider before you order.
The nbn fibre upgrade at a glance
| Question | Short answer | Source |
|---|---|---|
| Who can upgrade? | Selected FTTN and FTTC premises that nbn designates as simple premises | nbn full fibre upgrade page |
| Plan needed (FTTC) | Any speed plan, from 1 July 2026 | nbn statement, 1 July 2026 |
| Plan needed (FTTN) | A plan based on a wholesale 100/40 Mbps tier or above, until 31 March 2027 | nbn statement, 30 September 2026 |
| Cost | Free installation of nbn-supplied equipment only; provider charges may apply | nbn upgrade FAQs |
| Installation time | Usually 2 to 4 hours, sometimes longer | nbn step-by-step guide |
| Activation | Typically the same day, but it can take longer | nbn step-by-step guide |
Who is eligible for the nbn FTTP upgrade?
nbn’s full fibre upgrade page says selected homes and businesses on FTTN and FTTC can upgrade to FTTP with an eligible plan. Its fine print lists two conditions. nbn must designate the premises as a “simple premises”, and you must order a plan based on an eligible wholesale speed tier where one is required.
Not every street, or every house on a street, is eligible at the same time. nbn’s upgrade FAQs say locations were chosen for demand and cost-effectiveness, and some premises may not qualify because of build complexity. If yours is not eligible now, nbn says it may become eligible before the end of 2030. In its 13 January 2025 announcement, nbn said it would extend upgrades to around 622,000 more FTTN homes and businesses, with work expected to finish by the end of 2030.
The plan-speed requirement
This rule changed in 2026.
- FTTC. On 1 July 2026, nbn removed the high-speed plan requirement for customers in the FTTC footprint. Before then, most FTTC customers needed a plan based on the 100/40 Mbps wholesale tier or above. Now you can ask your provider for the upgrade on whatever plan suits you.
- FTTN. nbn’s 30 September 2026 statement says many FTTN customers must still order a plan based on a wholesale high-speed tier of 100/40 Mbps or above. nbn says it will remove that requirement from 31 March 2027.
- Apartments and complexes. Buildings with shared infrastructure go through a separate program (see the strata section below).
Retail plan names don’t always match nbn’s wholesale tiers, and providers can set their own conditions. For example, Aussie Broadband’s upgrade guide (updated 22 July 2026) lists its eligible FTTN plans from 500/50. Ask your provider which of its plans qualifies before you sign up.
How to check your address
Use the address checker on nbn’s full fibre upgrade page. Enter your street address and choose the residential or business check. If you’re not eligible yet, you can register for email updates and nbn will tell you if that changes. nbn also lists its participating providers. The list includes most large retailers.
What does the nbn fibre upgrade cost?
nbn’s step-by-step guide says the upgrade includes free installation of nbn-supplied equipment only. That is the key phrase. The free part covers nbn’s network and boxes, not your home network.
The standard installation includes:
- fibre cabling from the street to your home, using an existing pathway, surface-mounted cable or shallow-buried cable
- an nbn utility box on the outside wall, where site conditions require one
- an nbn connection box inside, and the fibre between the two boxes.
It does not include:
- a connection box in a location outside nbn’s guidelines, or your own cable pathway to get it there
- Ethernet cabling to put your router somewhere else or to reach other rooms
- a new Wi-Fi router, mesh system or other equipment
- changes to phone, alarm or other devices that used the old line.
There are other costs to watch. nbn’s FAQs say you may need to buy an eligible speed plan, and charges may apply if you downgrade or disconnect. nbn also says extra costs may apply to providers, who may pass them on to you. Ask your provider in writing what you will pay, whether there is a minimum period on the plan and what happens if you drop to a slower plan later.
For businesses, nbn’s upgrade page says that with an nbn Business Plan of 250 Mbps wholesale download or higher, the connection box can go up to 30 metres from the utility box.
How the FTTP upgrade works, step by step
nbn’s step-by-step guide (as published in September 2026) sets out the process:
- Check your equipment. nbn suggests reviewing your setup if your Wi-Fi router is more than five years old, and considering a router that supports at least Wi-Fi 6.
- Order through a participating provider. You don’t order from nbn. Your provider books the technician. To reschedule, you contact your provider, not nbn.
- Prepare for installation day. Renters need the landlord’s permission because the work usually involves drilling and sometimes digging. Someone over 18 must be home for the whole appointment to consent and sign. Secure pets, and expect power and internet to be off for 30 to 60 minutes.
- Installation. The technician runs fibre from the street. nbn’s FAQs say it uses existing conduit where it can. If not, it may surface-mount cable or bury it directly in the ground at a minimum of 150 mm deep, but only with the property owner’s consent. The utility box usually goes near your existing telco box at the front, at least 400 mm off the ground. The connection box goes inside, on the other side of that wall where possible, and connects to your router with an Ethernet cable.
- Activation. Your provider activates the service and lets you know. You keep using your old service in the meantime.
- Return the old box. nbn asks you to return your old nbn connection box for free at any Australia Post outlet, using a QR code from Australia Post’s nbn return page.
How long does the FTTP upgrade take?
nbn says the installation usually takes 2 to 4 hours but may take longer. If the technician can’t finish, nbn arranges a return visit. Activation is typically the same day, though nbn notes it can take longer depending on your provider. nbn doesn’t publish an order-to-connection time. Aussie Broadband’s guide estimates about 2 to 4 weeks from order to switch-on.
Some upgrades take longer. nbn’s FAQs say delays happen when the job is more complex than standard, when nbn needs more network work in your area, or when it needs approval from another utility, such as an electricity provider. nbn may finish the job remotely afterwards, so leave the connection box powered on. A blocked lead-in conduit is one example nbn gives of a complex installation; our lead-in conduit guide explains what happens next and what a repair costs.
What to decide before the installer arrives
Where the connection box goes
The upgrade is the cheapest time to get the box in a good spot. nbn’s FAQs say the technician will aim for a location within 1.2 metres of a power point and within 12 metres of the point where the fibre attaches to the building (or the nbn utility box). It should be on the ground floor of a multi-storey home, and not in a garage or bedroom unless you ask for it or there is no safe alternative. If you want it somewhere else, you will need your own cable pathway or an Ethernet run, at your cost. A customer-provided pathway means the installation can’t be finished that day. Our guide to moving your nbn connection box explains the location rules and what a registered cabler can change later.
Data points and Wi-Fi coverage
Your Wi-Fi router plugs into the new connection box, so the box location decides where your router sits unless you add cabling. nbn’s guide suggests a mesh system for larger homes, or a registered cabler to run Ethernet to access points, home offices, TVs and gaming consoles. Plan this before the technician arrives. Our data cabling cost guide has published price ranges for data points and comms cabinets.
Renters, strata and complexes
Renters. nbn requires the landlord’s permission before installation. In NSW, the government’s page on making changes to a rental property lists installing a phone or internet access line, and its equipment, among the minor changes a landlord cannot unreasonably refuse. You still need to ask in writing first.
Strata and complexes. If you live in an apartment, townhouse complex or strata-titled development with shared infrastructure, nbn’s building and complex upgrade program applies instead. The owners corporation or building owner registers interest after a majority vote. As published in August 2026, nbn charges a co-contribution of $275 (inc. GST) per unit and per common area service, paid as one joint payment by the owners corporation. A tenant or single owner can’t trigger this alone. Talk to your strata manager.
What happens to your old FTTN or FTTC service?
nbn’s FAQs say the new FTTP connection is installed alongside your existing FTTN or FTTC connection. The old service may stay active unless you cancel it, so check with your old provider that it is cancelled to avoid paying for both. If nbn decides to switch off the old technology at your address, it says it will tell your provider at least 18 months in advance. nbn said in July 2026 that it is prioritising FTTC for accelerated copper removal because FTTC has higher fault rates.
Phone and alarm lines need checking. nbn recommends contacting your provider and your device provider about whether medical alarms, security alarms, fire alarms, phones, fax and EFTPOS machines will be affected. If your security alarm reports over a phone line, ask your monitoring company about a mobile communicator. Our guide on alarms after the 3G shutdown explains 4G and dual-path communicator options.
Frequently asked questions
Is the nbn fibre upgrade free?
nbn installs its own equipment for free. You may still need a qualifying plan, your provider may pass on costs, and charges may apply if you downgrade or disconnect. Cabling and equipment inside your home are at your cost.
How long does the FTTP upgrade take?
The installation usually takes 2 to 4 hours, according to nbn. Activation is typically the same day. Complex jobs can take longer, and some need a return visit.
Do I need a faster plan to get fibre?
Not on FTTC since 1 July 2026. On FTTN, you need a plan based on a wholesale 100/40 Mbps tier or above until 31 March 2027, according to nbn. Your provider’s own rules may differ.
Can I choose where the new connection box goes?
Yes, within nbn’s guidelines. The technician will offer at least one location that meets them. Anything outside those guidelines needs your own pathway or Ethernet cabling, at your cost.
Will my alarm or home phone still work after the upgrade?
It depends on the device and how it connects. nbn recommends asking your provider and the device supplier before the upgrade.
Mac-Tek Telecom handles communications cabling, data points and home network upgrades across Penrith, Parramatta, Blacktown, Mount Druitt, St Marys and Western Sydney. Book a free on-site quote or call 0411 126 995. We can help you plan data points and Wi-Fi coverage around your new connection box, before or after nbn’s technician installs it.